I'm still preparing my panels. Today I put about 8 coats of gesso on about 40 paintings in the shed and still have some on the table to do with my current batch of traditional primer. They need to dry at least two days before I can go on the the next step. I also have a pile of sealed panels waiting to be primed once I clear the table and shed.
 |
44 panels drying |
 |
21 panels ready for gesso |
 |
86 waiting their turn |
No comments:
Post a Comment